ISO-certified cleanroom testing and validation in Redondo Beach, California. CalHERS Energy provides TAB Certified professionals serving Redondo Beach and the surrounding area since 2010. Call us today to schedule your project or request a free quote.
Phone: (916) 888-8770
Redondo Beach operates under Title 24 energy code requirements for CZ 6–9 (Mediterranean to semi-arid), with mechanical permits and energy compliance enforced by the Los Angeles County or city building department. Commercial HVAC installations require NRCA mechanical acceptance test certificates at final inspection. The city falls within the South Coast Air Quality Management District (SCAQMD) jurisdiction, which requires Authority to Construct permits for commercial boilers and large HVAC equipment above specified emission thresholds. SCE and SoCalGas serves the area and offers commercial efficiency incentive programs — many of which require third-party TAB (testing, adjusting, and balancing) documentation as a condition of rebate eligibility. With a population of 67K, Redondo Beach has a substantial commercial and industrial building stock. Redondo Beach's economy features aerospace manufacturing requiring cleanroom HVAC verification for precision assembly and contamination control, and technology campuses requiring data center cooling verification and server room air balancing — the types of large-scale commercial and industrial projects where our certified TAB team delivers the most value. CalHERS Energy is Northern California-based and travels to Redondo Beach for large commercial air balancing, cleanroom certification, Title 24 mechanical acceptance testing, and multi-building HVAC commissioning projects.
City of Redondo Beach Building Department or Los Angeles County Building Division
The Redondo Beach building department or Los Angeles County Building Division issues mechanical permits and enforces Title 24 energy code compliance. NRCA mechanical acceptance test certificates are required at final inspection for all commercial HVAC systems. South Coast Air Quality Management District (SCAQMD) Authority to Construct permits may be required concurrently for boilers and large commercial HVAC equipment with emissions above district thresholds. CalHERS Energy coordinates directly with Redondo Beach building officials and inspectors when providing TAB services for large commercial projects in the area.
We certify cleanrooms from ISO Class 1 (extremely stringent, semiconductor fabrication) through ISO Class 9 (general controlled environments). ISO 14644-1 defines these classes by maximum particle counts per cubic meter: ISO 5 allows 3,520 particles ≥0.5μm (equivalent to Class 100), ISO 7 allows 352,000 particles (Class 10,000), and ISO 8 allows 3,520,000 particles (Class 100,000). Pharmaceutical, biotech, and compounding pharmacies typically require ISO 5-7 classifications.
ISO 14644-compliant certification includes: particle count classification at multiple sampling points, HEPA/ULPA filter integrity testing using photometer leak detection, airflow velocity and uniformity measurements, room pressurization and cascade verification, air change rate calculations, recovery time testing (how quickly the room returns to specification after upset), and optional temperature/humidity monitoring. All results are documented in a comprehensive certification report.
ISO 14644-2 recommends recertification intervals based on cleanroom class: ISO 5 and cleaner—every 6 months; ISO 6-7—every 12 months; ISO 8-9—every 24 months. However, FDA GMP facilities, USP 797/800 compounding pharmacies, and semiconductor fabs often require more frequent testing (quarterly or semi-annually) to maintain regulatory compliance. Many clients schedule testing during annual shutdowns.
HEPA filter integrity testing (also called filter leak testing or filter scan testing) verifies that installed HEPA filters have no leaks at the filter media, frame, or gasket seal. Using an aerosol generator and photometer, we scan the entire filter face and perimeter. A leak exceeding 0.01% of upstream concentration indicates a failed seal. Even small leaks can allow contaminants to bypass filtration and compromise product quality or patient safety.
Certification duration depends on cleanroom size, class, and number of test points. A small ISO 7 compounding pharmacy may take 4-6 hours; a large pharmaceutical fill line with multiple ISO 5 zones may require 2-3 days. We provide detailed scheduling estimates after reviewing your facility specifications. To receive a proposal, submit your cleanroom details to Office@calherstab.com or use our online contact form.
As-built testing occurs when the cleanroom is complete but empty—no equipment, no personnel. At-rest testing includes equipment but no production activity. Operational testing occurs during normal production with typical personnel present. ISO 14644 requires defining the occupancy state for certification. Most pharmaceutical facilities require operational testing to validate worst-case conditions, while initial construction typically uses as-built or at-rest.
Yes, we specialize in USP 797 (sterile compounding) and USP 800 (hazardous drug handling) certification for California pharmacies. This includes ISO classification testing for primary engineering controls (laminar flow hoods, biological safety cabinets), buffer rooms, and ante-rooms, plus pressure differential verification, ACPH calculations, and surface sampling coordination. Our reports are formatted for Board of Pharmacy inspections.
Before certification: complete all construction and HVAC commissioning, clean all surfaces per your SOPs, operate the HVAC system at normal conditions for 24+ hours, install all HEPA filters and seal penetrations, ensure access to all sampling locations, and have facility drawings and specifications available. For occupied facilities, coordinate testing around production schedules. Contact us at Office@calherstab.com to discuss pre-test requirements for your specific facility.