Title 24 Acceptance Testing proves that your new HVAC controls and systems actually work the way they're supposed to. It's the inspection that happens before final sign-off, and it matters for getting your project closed on time without surprises.
What is Mechanical Acceptance Testing?
California's Title 24 energy code requires buildings to pass tests that verify:
• HVAC fans start up and shut down correctly
• Temperature and humidity controls work as designed
• Fresh air and ventilation systems operate properly
• Energy-saving equipment like economizers function correctly
• Variable speed fans adjust as intended
• Thermostats and zone controls respond appropriately
Think of it as a dress rehearsal before opening day—we verify everything works before the inspector shows up.
When You Need This Testing
Your project needs Title 24 acceptance if you're:
• Installing new HVAC controls or upgrading existing systems
• Adding variable frequency drives (VFDs) or demand-controlled ventilation
• Building new or significantly renovating an existing building
• Required by your building permit or energy code plan check
• Ready for final inspection and need documentation
When Your Inspector Asks "Who's Doing the Title 24 Acceptance?", You Call Us.
What We Test and Verify
We verify that your:
• Air handlers start, stop and operate safely
• Temperature and humidity controls maintain setpoints
• Outside air dampers open and close correctly
• Economizers (free cooling) work as designed
• Variable frequency drives (VFDs) ramp fan speeds up and down
• Zone thermostats control individual rooms
• Occupancy sensors adjust ventilation
• Energy management systems track and log data
How We Do It
Step 1 – Planning: We review your design plans and specifications so we know what "working correctly" means.
Step 2 – Site Coordination: We coordinate with your mechanical and controls contractors to ensure all systems are ready to test.
Step 3 – Testing: We run each test, document whether it passes, and note any issues or adjustments needed.
Step 4 – Documentation: We complete all required forms with photos, notes and evidence that inspectors expect.
Step 5 – Follow-Up: If anything needs adjustment, we create a punchlist and return to verify fixes and re-test.
The Result: Your project passes Title 24 inspection without delays.